One stop solution for HVAC and clean room
- 30+ years of HVAC and cleanroom experience, established in 1994
- 3,200+ employees and a 930,000 m² production base
- Complete equipment portfolio: chillers, packaged units, AHUs, FCUs, filters and ventilation products
- Cleanroom design with HEPA/ULPA filtration, airflow, pressure and temperature/humidity control
- Turnkey delivery: design, equipment, installation, commissioning, validation and maintenance
- Experience across healthcare, pharmaceutical, semiconductor, aerospace, food, dairy and real estate
- Overseas project support through Yatai International
- Group manufacturing and testing centers for chillers and HVAC products
Commercial HVAC and cleanroom systems are for projects that need a single partner from concept to commissioning. The portfolio covers chillers, packaged units, air handling units, fan coils, filters, ventilation and cleanroom equipment, backed by group manufacturing, testing and project delivery teams.
One partner from design to validation
- HVAC load calculation, equipment selection and system layout
- Cleanroom classification, airflow and pressure-differential design
- Chillers, AHUs, FCUs, filters and ventilation equipment from one portfolio
- Installation, commissioning, performance testing and documentation
- Preventive maintenance, spare parts and remote monitoring support
Typical project scope
Segment | Applications | Yatai scope |
|---|---|---|
Healthcare | Operating rooms, ICU, isolation wards, laboratories, clean supply | Cleanroom HVAC, filtration, pressure control, chillers |
Pharmaceutical | Cleanrooms, QC labs, production suites | AHUs, HEPA filters, cleanroom turnkey delivery |
Commercial | Offices, hotels, malls, schools, airports | Chillers, packaged units, AHUs, FCUs, ventilation |
Industrial | Electronics, semiconductor, aerospace, food and dairy | Process cooling, cleanroom systems, air filtration |
Project scope and equipment selection are tailored to the building, local codes and cleanroom classification. Contact FulCare for a feasibility review and preliminary equipment schedule.